Tailings Dewatering Project
Tailings Dewatering Project
A new dewatering circuit is being designed and constructed for a client, where I am responsible for the following tasks under the supervision of a Senior Piping Engineer:
Performing Slurry piping calculations for calculating the pipe size and slope.
Calculation of settling velocities of solid particles in slurry pipelines.
Coordinating with designers to finalize the piping layout.
Sizing the pumps, tanks, splitter box, and other mechanical equipment.
Calculating the loads on pipe supports.
Preparation of P&IDs and conducting a 3D model and Isometric drawing review.
Conducting a study to assess the pumping capacity of the Barge Water Booster Pump for Centrifuge CIP (clean in place) using AFT Fathom
AFT Fathom was used to carry out a study to assess the pumping capacity of Barge Water Booster Pump